| Engineering |
| |
|
Professional Head of M&E Design |
| Manchester, Closing date: 13th
March
2012, Ref: PHMED2911* |
| To provide technical leadership to
the Electrical and Power design function within the Colas Rail
Engineering division. |
|
......................................................................................................................................................................................... |
|
Design Engineer – OLE |
| Manchester, Closing date: 1st
April 2012, Ref: DEOLE2911 |
| You will be working as part of the
Overhead Line Engineering Team and be responsible for the design of
overhead catenary systems for Network Rail but also there will be a
requirement for the design of Metrolink Systems. |
|
......................................................................................................................................................................................... |
|
Lead Surveyor (x 3) |
| UK National, Closing date: 30th
March 2012, Ref: NLS291 |
| To lead a team of one or more
surveyors in carrying out surveying activities, whilst accurately and
reliably producing survey data to present to clients or designers. To
carry out topographical and railway surveys, to the requirements of
survey specifications in contracts or to the requirements of Designers. |
|
......................................................................................................................................................................................... |
|
Surveyor (x 3) |
| UK National, Closing date: 30th
March 2012, Ref: NS291 |
| To carry out surveys from start to
finish and support the Project Manager and Lead Surveyor in the
execution of all topographical and railway surveys. |
|
......................................................................................................................................................................................... |
|
Senior Planner |
| Manchester, Closing Date:
30th March
2012, Ref: SP2911 |
| To create, maintain and update
individual project programmes within the Engineering Division and produce
reports as required. |
|
......................................................................................................................................................................................... |
|
Design Engineer Permanent Way |
| Swindon, Closing Date:
30th March
2012, Ref: DEPWS2911 |
| Ensure that the conductor rail design
is competently undertaken, with drawings and documentation delivered to
the appropriate Colas Rail and Client standards, specifications and
programme constraints. |
|
......................................................................................................................................................................................... |
|
Design Engineer Signalling |
| Swindon, Closing Date:
30th March
2012, Ref: DESS2911 |
| To produce Signalling Design details
broadly in the form of Scheme/Signalling plans, Control Tables, location
diagrams, cable core plans, power schematics and interlocking wiring
produced under his / her control ensuring adherence to all Colas Rail
and Client Standards. The post holder will be required to produce
Network Rail signaling design GRIP4 deliverables. |
|
......................................................................................................................................................................................... |
|
Senior Design Engineer Signalling |
| Swindon, Closing Date:
30th March
2012, Ref: SDESS2911 |
| Ensure that Signalling Designs are
competently undertaken and documentation delivered to the appropriate
Colas Rail and Client Standards. To produce Signalling Design details
broadly in the form of Scheme/Signalling plans, Control Tables, location
diagrams, cable core plans, power schematics and interlocking wiring
produced under his or her control ensuring adherence to all Colas Rail
and Client Standards. The post holder will also be required to make
recommendations when assessing the workload. |
|
......................................................................................................................................................................................... |
|
Principle Design Engineer Signalling - Verifier |
| Swindon, Closing Date:
30th March
2012, Ref: PDESVS2911 |
| Ensure that Signalling Designs
are competently undertaken and documentation delivered to the
appropriate Colas Rail and Client Standards. To act as Lead Engineer in
producing signaling designs broadly in the form of Scheme/Signalling
plans, Control Tables, location diagrams, cable core plans, power
schematics and interlocking wiring produced under his or her control
ensuring adherence to all Colas Rail and Client Standards. |
|
......................................................................................................................................................................................... |
|
Senior Design Engineer Permanent Way |
| Swindon, Closing Date:
30th March
2012, Ref: SDEPWS2911 |
| Ensure that permanent way designs are
competently undertaken, with drawings and documentation delivered to the
appropriate Colas Rail and Client standards, specifications and
programmes. |
|
......................................................................................................................................................................................... |
|
Principle Design Engineer
Permanent Way |
| Manchester, Closing Date:
30th March
2012, Ref: PDEPW2911 |
| Ensure
that permanent way designs are competently undertaken, with drawings and
documentation delivered to the appropriate Colas Rail and Client standards,
specifications and programmes. |
|
......................................................................................................................................................................................... |
|
Principle Design Engineer - Signalling |
| Manchester, Closing Date:
30th March
2012, Ref: PSDE2911 |
| The role of Principle Design Engineer
working inside a multi-disciplinary office carries the responsibilities
of technical verification of design, production and review of design
documentation, interface with other disciplines and facilitating a
relationship with the client. |
|
......................................................................................................................................................................................... |
|
Design Engineer |
| Manchester,
Closing Date:
30th March
2012, Ref: DM2911 |
| To produce Signalling
Design details broadly in the form of Scheme/Signalling
plans, Control Tables, location diagrams, cable core
plans, power schematics and interlocking wiring produced
under his / her control ensuring adherence to all Colas
Rail and Client Standards. The post holder will also be
required to make recommendations when assessing the
workload. |
|
......................................................................................................................................................................................... |
| |