view our top 10 references


we are actively recruiting

               TRAINING AND ASSESSMENT CENTRE
 
 
Training Courses
Track SafetyElectrificationSafetyRailway OperationsPermanent WayAssessments
 
Information
FacilitiesContact DetailsDirections
   
  ELECTRIFICATION
   
    DC Lines Level A - “Procedure A” – (Southern)
    To train staff in the procedure to issuing out safety documentation in connection with current isolation.

  DC Lines Level A – “Procedure B “ – (North London Line)
    To train staff in the procedure to issuing out safety documentation in connection with current isolation.

  DC Lines Level B – Testing / Strapping
    To train staff to test that the conductor rail is not energized and to fit short circuiting straps.

  DC Lines Level - Switching
    To train staff to operate local track isolating switches as part of the procedure to isolate the conductor rail.

  DC Lines Level – Temporary Isolation
    To train staff to obtain a temporary isolation of the conductor rail in accordance with the electrified line working

    instruction.  

  Machine Switch Out
    To train staff to undertake the duties required in order to obtain a “machine switch out” in accordance with the 

    electrified lines working instruction.

 

     © 2010 Colas Rail Ltd      

                          www.colasrail.co.uk